Analisis Perhitungan Energi Pengereman Regeneratif Kereta MRT Berdasarkan Mode Operasi Otomatis Kereta MRT Jakarta
Abstract
Full Text:
PDFReferences
JMEC, DGR-MoT-RI. “Engineering Consulting Services for Jakarta Mass Rapid
Transit System Project,”. Jakarta: Ditjen Perkeretaapian. 2010.
P. C. SEN. Principles of Electric Machines and Power Electronics, vol. 53, no. 9.
K. Muralidhar et al., Fundamentals of Electrical Drives
H. H. Sasmita, A. Nugroho, and T. Sukmadi. Optimasi Penggunaan Sistem
Pengereman Regeneratif Dan Pneumatic Pada Kereta Rel Listrik Jabodetabek
Menggunakan Metode Particle Swarm Optimization (Pso). 2018
M. Thong and A. Cheong. “Energy Efficiency in Singapore’s Rapid Transit
System,” Journeys, no. May, pp. 38–47. 2012
E. Emplacement, R. Dc, T. Power, and U. Rail, “Railway Research,” vol. 1, pp.
– 22. 2014
K. (Dayton T. B. Cummings. “Feasibility Study of On-Car Regenerative Braking
System (RBS) for Electric Rail Applications,”, pp. 1–52. January 2013
Tsuyoshi Nakamura. “MRTJ CP108 Project Maintenance Manual Chapter 5
PROPULSION SYSTEM. Jakarta: Author. 2018.
Tsuyoshi Nakamura. MRTJ CP108 Project Operation Manual Operation Manual,
vol. 2018. Jakarta: Author. 2018.
PT MRT Jakarta. Engineering design and tender assistances consulting services for
phase II section of jakarta MRT system north-south 57 line project. Jakarta: Author.
Zulkifli Khoirun Zimam. Pemanfaatan Energi Pengereman Regeneratif Motor
Induksi 3-Fasa 126 kW 74Hz MRT Jakarta. Jakarta: Author. 2020.
Jakarta MRT Construction Management Consultants. Resubmission of technical
design report for technical specification of auxiliary power supply construction of
jakarta MRT project contract package of rolling stock section. (No. 108). Jakarta:
Sumitomo Corporation. 2019.
Pradipta Bintang Perdana. Analisa Penggunaan Regeneratif Brake Pada Mobil
Multiguna Pedesaan Bertenaga Listrik. Surabaya: Author. 2013
Refbacks
- There are currently no refbacks.
Sekretariat:
Sosial Media: